Wairarapa Corridor Plan - Adopted December 2003

Search in document library
  • Published Date Mon 20 Aug 2007
All Tags

The Wairarapa Corridor Plan was adopted in December 2003
and re-printed in its new format alongside the Wellington
RLTS 2007 - 2016.

The corridor plan addresses needs, issues, outcomes and
actions for the Wairarapa Corridor which follows State
Highway 2 from Upper Hutt over the Kaitoke and Rimutaka
Hills through to Masterton and on to Mt Bruce; and the
Wairarapa railway line from Upper Hutt through to
Wairarapa. It also includes State Highway 53.
Updated December 6, 2022 at 11:30 PM