Western Corridor Risk Assessment Workshop Report
Search in document library
Outlines the trends and analyses the risks that were made
apparent at the Risk Assessment workshop held on 24
February 2005.
The workshop was attended by the members of the Technical
Steering Group with the purpose of identifying and assessing
risks that could affect the Western Corridor Transportation
Study.
apparent at the Risk Assessment workshop held on 24
February 2005.
The workshop was attended by the members of the Technical
Steering Group with the purpose of identifying and assessing
risks that could affect the Western Corridor Transportation
Study.