Hutt Corridor Plan: Adopted December 2003
Search in document library
The Hutt Corridor Plan was adopted in December 2003 and
re-printed in its new format alongside the Wellington Regional
Land Transport Strategy 2007 - 2016.
The corridor plan addresses needs and issues,
outcomes and actions for the Hutt Corridor which
follows State Highway 2 and Wairarapa railway line from
Ngauranga through to Upper Hutt.
re-printed in its new format alongside the Wellington Regional
Land Transport Strategy 2007 - 2016.
The corridor plan addresses needs and issues,
outcomes and actions for the Hutt Corridor which
follows State Highway 2 and Wairarapa railway line from
Ngauranga through to Upper Hutt.