Response to LGOIMA request 2026-437 16 November 2026

Search in document library
Response to LGOIMA request 2026-437 16 November 2026 preview
  • Published Date Mon 16 Nov 2026
All Tags

Information requested:

Following the release of the Transport Accident Investigation Commission’s interim report into the 6 June train accident at Khandallah, I am seeking clarification about the safety measures undertaken following the accident and the information provided to passengers and nearby residents.

The interim report raises some concerning matters, including the train passing a red signal, the mechanical train-stop protection not activating, and train control learning of the accident through emergency services.

I appreciate that the independent investigation is ongoing and should not be pre-empted. However, four months is a considerable time for passengers and nearby residents to be left wondering what safety assessments and precautions were undertaken before services resumed.

Could you please provide a written response to the following:

Safety checks and remedial measures: What inspections, safety checks and assessments were undertaken following the accident and before passenger services resumed? Were any faults identified or changes made to signalling, train-stop protection or operating procedures?
Assurances to Greater Wellington: What formal assurances did Greater Wellington receive from KiwiRail and the rail operator before services resumed? Were these supported by documented risk assessments or independent technical advice?
Risks to neighbouring properties: Has an assessment been undertaken of the potential consequences of a train overrunning the stop block, particularly for homes below the steep bank near the accident site? If so, what were the findings and have any additional protections been considered?
Train control and emergency notification: Has the adequacy of the incident notification and response arrangements been reviewed, given the circumstances described in the interim report? Have any changes been made?
Governance oversight: What information was provided to Greater Wellington’s elected members following the accident, including the safety assessments and assurances received before services resumed? When was this information provided, and were any further assurances sought?
Communication with passengers and residents: What information has been provided to passengers and nearby residents about the safety checks, any remedial measures and the decision to resume services? When and through which channels was this communicated? If no direct communication occurred, what consideration was given to providing it?
Outstanding matters: Are there any further safety-related assessments, remedial works or investigations relevant to the continued operation of the Johnsonville line? If so, what are the expected timeframes

I recognise that KiwiRail owns and maintains the rail infrastructure and that the rail operator has its own safety responsibilities. However, Greater Wellington contracts the passenger service and has an important role in seeking assurances and ensuring the public is appropriately informed.

My concern is not simply what happened on 6 June, but what happened afterwards. Passengers and nearby residents should not be the first to experience the consequences of a safety failure and the last to hear what has been done about it.

I am not suggesting that the line is unsafe. I am asking for clarity about the measures taken, the assurances received and how these have been communicated.

I would appreciate an initial response within ten working days, even if some of the technical information needs to be obtained from KiwiRail or the rail operator.

Updated November 17, 2026 at 2:39 PM