Skip to content

Rules about destruction, damage, or disturbance of foreshore or seabed

https://archive.gw.govt.nz/rules-about-destruction-damage-or-disturbance-of-foreshore-or-seabed

Rules about destruction, damage, or disturbance of foreshore or seabed

Updated 3 July 2015 12:25pm
  • Rule 28 Clearance of piped stormwater outfalls
  • Rule 29 Beach grooming and re-contouring
  • Rule 30 River and stream mouth cutting
  • Rule 31 Launching, retrieval, navigation and mooring of vessels
  • Rule 32 Drilling
  • Rule 33 Maintenance dredging within the Commercial Port Area or Lambton Harbour Development Area
  • Rule 34 River and stream mouth cutting
  • Rule 35 Dredging for river management purposes
  • Rule 36 Maintenance dredging outside the Commercial Port Area and Lambton Harbour Development Area
  • Rule 37 Major disturbance of foreshore and seabed (excavate, drill, move, tunnel etc.), including any removal of sand, shell or shingle outside the Lambton Harbour Development Area, Commercial Port Area, Harbour Entrance or Hutt River Mouth
  • Rule 38 Major disturbance of foreshore and seabed (excavate, drill, move, tunnel etc.), including any removal of sand, shell or shingle within the Lambton Harbour Development Area, Commercial Port Area, Harbour Entrance or Hutt River Mouth Area
  • Rule 39 Disturbance of foreshore and seabed (excavate, drill, move, tunnel etc.), including any removal of sand, shell or shingle in Areas of Significant Conservation Value
  • Rule 40 Other activities involving the destruction, damage, or disturbance of foreshore or seabed outside Areas of Significant Conservation Value
  • Rule 41 Dredging in the Hutt River mouth area for river mouth management purposes including any removal of sand, shell or shingle
  • Rule 42 Major disturbance of foreshore and seabed (excavate, drill, move, tunnel, etc) including the removal of sand, shell or shingle or other material
  • Rule 43 Other activities involving the destruction, damage or disturbance in Areas of Significant Conservation Value